THD Harmonic Calendar
Compare collective and DOB-anchored personal timing across Daily, Weekly, Monthly, and Yearly harmonic layers.
Calendar Settings
Your birth date is the sole anchor for personal harmonic timing.
Privacy: calculations run locally in this browser. The tool does not submit or store the date of birth.
Defaults to the current local date.
The selected range controls the page, print, CSV, and ICS output.
Processor not loaded. Enable the THD Calendar JavaScript snippet and view the published page.
Current Date Signal
Enter a date of birth and generate the calendar.
Color Legend
Emergence: start, explore, prototype
Contrast: review, correct, refine
Integration: finish, organize, implement
Mixed: matched layers indicate different phases
Neutral: no direct collective/personal match
Date Range Outlook
Generate the calendar to view the selected date range.
Purpose
The calendar compares the collective Turtle Calendar with a personal calendar anchored only to date of birth. A layer aligns when the collective and personal phases match in that same layer.
The interface is daily-first. A Daily match names the date. Weekly, Monthly, and Yearly matches provide support or background context.
Color Coding
| Color | Signal | Meaning | Practical Use |
|---|---|---|---|
| Emergence | Formation, opening, possibility, or a new direction. | Start, explore, prototype, test, or introduce. | |
| Contrast | Pressure, resistance, correction, or testing. | Review, repair, refine, slow down, or resolve weak points. | |
| Integration | Resolution, synthesis, completion, or stabilization. | Finish, organize, decide, publish, implement, or consolidate. | |
| Mixed | Multiple matched layers point to different phases. | Inspect the details and act selectively. | |
| Neutral | No direct collective/personal match. | Use ordinary judgment. |
The Three Phases
EmergenceFormation. A signal enters the field and begins taking shape.
ContrastTesting. The signal encounters pressure, limits, or correction.
IntegrationStabilization. Prior pressure resolves into a usable form.
Calculation Rules
| Layer | Collective Logic | Personal Logic |
|---|---|---|
| Daily | Original Turtle Calendar logic: March 20 year start, 364 harmonic days, skip days removed, then Cycle Day 1–28. Days 1–9 are Emergence, 10–18 Contrast, and 19–28 Integration. | Birth date is Personal Day 1. The personal Daily phase advances through the same repeating 28-day structure. |
| Weekly | Dominant collective Daily phase across the seven-day window beginning on the selected date; collective skip days are ignored. | Dominant personal Daily phase across the same seven-day window. |
| Monthly | The current 28-day harmonic block is assigned recursively through Emergence, Contrast, and Integration in repeating block order. | The current DOB-anchored 28-day block uses the same repeating block-phase order. |
| Yearly | The current position within the 364-day Turtle year is divided into Emergence, Contrast, and Integration sectors. | The current position within the DOB-anchored 364-day personal year is divided into the same three sectors. |
Layer Use
| Layer | Question | Use |
|---|---|---|
| Daily | What should I emphasize on this date? | Immediate actions and decisions. |
| Weekly | How should I pace the short-term period? | Scheduling, coordination, and near-term pressure. |
| Monthly | What project-cycle phase is active? | Campaigns, projects, and medium-range execution. |
| Yearly | What larger timing season is active? | Long-term direction and broad annual context. |
Daily-First Labels
| Condition | Label |
|---|---|
| Daily layer matches | Emergence Day, Contrast Day, or Integration Day |
| Daily and larger same-phase layers match | Phase Day with Weekly, Monthly, and/or Yearly Support |
| Larger layer matches without Daily match | Background Phase Alignment |
| Matched layers point to different phases | Mixed Harmonic Signal |
| No matching layers | Neutral Day |
Skip Days
March 19 and February 29 in leap years are outside the collective 364-day harmonic cycle. They receive no collective Daily phase. The personal DOB cycle continues normally.
Exports
Print creates a planning view. CSV includes full layer data and metadata. ICS creates one 7:00–7:15 AM event with a notification for each date in the selected range.
